Published by: Jason Cooney – Tsaks Consulting UK | Updated: October 2026
Key procurement details:
-
Buyer: Codi Group Ltd (formerly Pobl Group & Linc Cymru)
-
Estimated value of the framework: £750m ex VAT / £752.5m inc VAT
-
Term: 4 Years (1 April 2027 to 31 March 2030, 1-year discretionary extension to 31 March 2031)
-
Enquiry deadline: 13 November 2026 (4:00 PM)
-
Submission Deadline: 20 November 2026 (2:00 PM)
-
Procurement system: Open Procedure via eTenderwales (ITT 127135)
Overview: A large pipeline for Welsh Social Housing Contractors
Codi Group Ltd—formed following the major merger between Pobl Group and Linc Cymru—has officially launched its flagship £750m Construction Framework. This is a significant opportunity as they will be appointed up to 48 principal main contractors across six distinct residential development lots servicing Wales.
For contractors who secure a place on the framework, thy will gain access to partner a high volume of long term across the Welsh Housing sector as social landlords —including Ateb Group, Tai Hedyn, and United Welsh Housing Association may procure through the panel.
💡 Jason Cooney – Director’s Insight – Why this framework matters:
Given the recent merger of Linc Cymru and Pobl, this is one of the largest and most strategically important frameworks in Welsh housing. There are two reasons for this. 1. It locks on revenue for four years. 2. It locks in revenue from the four major RSL pipelines. This will be a very competitive frameworks that most and if not all maintenance providers across Wales will be interested in.
Lots and geographic distribution
Contractors may bid for a maximum of 2 lots and can be awarded a maximum of 2 lots. Lots include:
| Lot | Scheme Size / Scope | Region | Estimated Lot Value (ex VAT) |
| Lot 1a | Up to 20 Dwellings | West | £5,819,876 |
| Lot 1b | Up to 20 Dwellings | East | £20,765,427 |
| Lot 2a | 21 to 50 Dwellings | West | £80,283,725 |
| Lot 2b | 21 to 50 Dwellings | East | £177,818,727 |
| Lot 3 | 51 to 100 Dwellings | All Wales | £211,126,750 |
| Lot 4 | Over 100 Dwellings | All Wales | £254,185,495 |
🎯 LOT SELECTION STRATEGY — Pitfalls to Avoid:
We recommend prioritising retaining existing business as opposed to looking to expand if you don't have the capacity and experience. For example, bidding on Lots 3 and 4 is ambitious if you are a small to medium provider. You want to score high on all quality scores in order to be successful. Therefore, if you have the case studies and credibility to bid for say lot 2a and 2b, then do so and maximise your prospects of success.
Evaluation criteria: the standard 60/40 split
Across all six lots, Codi Group has set the award evaluation weighting at:
-
Quality Score: 60.00%
-
Price / Commercial Score: 40.00%
With 60% of the score hanging on quality responses, you need to ensure you integrate evidence in your response, that is tailored to not only Welsh housing policy, but also the supply chains and local geographic areas you wish to service.
Focus areas
-
Welsh policy & environmental standards: Your submission needs to align with Welsh Government housing standards (WHQS 2023), net-zero carbon targets, and the relevant sustainable construction practices.
-
Supply chain & local economic resilience: List your local suppliers, what services they will provide, and what percentage of your supply network they represent to demonstrate your regional supply and resource capacilit.y
-
Social value and community benefits: Evaluators expect clear, trackable social value outcomes—including local employment, apprenticeships, and direct community engagement.
📊 BID WRITING ADVICE from Jason Cooney — Winning the 60% Quality Portion:
I think you need to focus on your capability and experience in Wales in order to score well in this framework. Social value and a serious commitment to the local economy with real evidence will also be critical to success.
Risk factors for this framework
Some key points to consider before making the decision to bid:
-
No guaranteed volumes: Inclusion on the panel does not guarantee contract values; call-off contracts can be awarded either with or without further competition. However, it is a significant opportunity that generally warrants the resources allocated to bidding.
-
Resource & capacity management: With a bidding limit of 2 lots, your bid or tender needs to demonstrate that you possess the operational bandwidth to service peak call-off demand without overextending local labor pools.
-
Procurement Act 2023 Rules: This procurement is governed under the Procurement Act 2023 frameworks (Notice identifier: 2026/S 000-086688), requiring rigid adherence to compliance, transparency, and self-assessment declarations.
How Jason and the team here at Tsaks Consulting UK can help you win a spot
Bidding for a place on a £750m framework requires a structured submission strategy. Our team of public sector bid specialists provides end-to-end tender support, including:
-
Bid / No-Bid & Lot Alignment Auditing: we will help; you ensure you bid for the lots that give you the highest prospects of success (and revenue).
-
Comprehensive response writing: written by experienced bid writers with experience in Welsh construction frameworks and housing association procurements.
-
Critical review and red team scoring: An independent, evaluator-style review of your draft responses to ensure alignment with Codi Group’s scoring matrix.
Ready to build your submission?
With the 20 November 2026 submission deadline approaching, early preparation is key to securing your place on this major Welsh framework.
📞 Contact Tsaks Consulting UK today to schedule a tender review with one of our bid directors.
